ENERGY COMPLIANCE

CALIFORNIA TITLE 24

Energy-code documentation for applicable California residential and non-residential projects.

Start Your Title 24 Review
★★★★★ California energy compliance support.
California residential and non-residential project plans with Title 24 energy documentation
California Energy Code Compliance

California Projects. Title 24 Compliance.

Your CF1R has to be registered with a HERS provider before it reaches the building department. We handle that.

Model It for
Your Climate
Zone

California has sixteen climate zones and the same house passes differently in each. We model envelope, HVAC, water heating and lighting against the zone your project is actually in.

California project envelope, HVAC, lighting, and energy-efficiency review

Registered CF1R,
Ready to
Submit

Your Certificate of Compliance, registered through a HERS provider and listing exactly which measures need field verification — so your rater and your inspector are working from the same document.

California Title 24 project-specific compliance documentation
California Title 24 compliance documentation and project plans

The Title 24 documentation was clear and helped keep our California project moving.

★★★★★87+ 5-Star Reviews

California Title 24 Compliance

Start at $160 $125 SPECIAL PRICE

Project-specific California energy compliance documentation based on applicable project requirements.

Start Your Title 24 ($125)
Included in Your Title 24 Service

Including

  • Building Envelope Review
  • Insulation Inputs
  • Windows & Glazing
  • HVAC Information
  • Lighting Information
  • Water Heating
  • Energy Compliance Review
  • Compliance Documentation

Turn Energy Requirements Into a Clear Submission Path.

Start with the drawings and build the compliance package from there.

Start Your Title 24 ($125)

California Title 24 FAQs

What is Title 24? +
Part 6 of the California Building Standards Code — the state's energy efficiency standards. Your compliance documentation is the Certificate of Compliance, usually called a CF1R or "the Title 24," and no building department in California will issue a permit without it.
Does my CF1R need to be registered? +
Yes, when the project requires HERS verification — the CF1R has to be registered through an approved HERS provider registry before it goes to the building department. An unregistered form gets rejected at the counter.
What is HERS verification, and will my project need it? +
HERS verification is field testing and inspection by a certified third-party rater — things like duct leakage and refrigerant charge. It's required for most new residential construction and for many HVAC alterations. Your CF1R lists exactly which measures need it, so you and your rater are working from one document. The rater is separate from us and separate from your contractor; the code requires their independence.
Why does my climate zone matter so much? +
California is divided into sixteen climate zones and the requirements differ between them. The same house that passes in one zone can fail in another, so the first thing we confirm is the zone your project is actually in — not the nearest city.
Do you support commercial projects? +
Yes — nonresidential Title 24 uses a different compliance path and different forms from residential. Send us the occupancy and square footage and we'll confirm scope before you order.
What do you need to start? +
Architectural drawings (floor plans, elevations, window and door schedule), assembly details, and your proposed HVAC, water heating and lighting. If the equipment isn't selected yet, we can model to a spec and update once you decide.
How long does it take? +
Most residential projects are back within 24 hours and commercial projects within 24–48 hours.
Can HVAC calculations be added? +
Yes. Manual J, D and S can be produced alongside the Title 24 work so your equipment sizing, duct design and energy model all agree — which is what a plan reviewer checks for when something looks inconsistent.

How It Works

1. Share Project Info

Send plans, location, envelope information, and relevant system information.

2. We Evaluate the Project

We review applicable envelope, HVAC, lighting, and energy-efficiency information.

3. We Prepare Title 24

We organize the required project-specific compliance information.

4. Use With Confidence

Use the documentation to support the California project workflow.

Need Another Technical Service?

Explore our HVAC and energy-compliance services.

Explore All Services